Features · Nesting & yield

Know what a part really costs off the sheet.

BuildMRP accounts for sheet yield, so your part cost includes the scrap you actually make.

16parts / sheet
[X]%yield
[$X]material / part

Why it matters

Area-based costing undercounts every part.

Most MRPs price a part by its area. Real sheets leave a skeleton and offcuts — and that waste is part of the cost.

Naive cost[$X]part area × price per sq ft
True cost[$Y]sheet cost ÷ parts per sheet

How it works

Three settings, accurate costs everywhere.

  1. 01

    Set material & sheet cost

    e.g. 3/16" 5052 aluminum, 48×96, [$X] per sheet.

  2. 02

    Set yield for the process

    Plasma material efficiency, per part or default.

  3. 03

    It rolls up everywhere

    Part → variant → Shopify cost, automatically.

part cost = (sheet cost ÷ parts per sheet) + (cut time × process rate)

The full cost stack

Every dollar in the part, accounted for.

Material
Cutting
Labor
Pack
Illustrative proportions — your numbers come from your BOMs.

Roadmap · Coming [QUARTER]

Nest-file import & remnant tracking.

Import nests from ProNest or SigmaNEST, split sheet cost and cut time across the parts on each sheet, and put usable offcuts back into stock.

Cutting head over a steel sheet

Free tool

Try it: sheet nesting calculator
Open calculator

Yield FAQ

Plasma or laser?

Both — set the yield and process rate per cutting method.

Steel and aluminum?

Any sheet or plate material, each with its own cost.

How do I set yield?

Use your nest reports or the calculator; set a default and override per part.

Multiple thicknesses?

Yes — each thickness is its own raw material.

Price parts on real costs.

Join the waitlist